Bakers of Danbury recently carried out a refurbishment at Witham Fire Station which included two classrooms and an office. Chrysotile asbestos was removed from the ceilings of the classrooms before works began. Works
Please Wait For Loading
Eves Corner, Danbury, CM3 4QB 01245 225876 info@bakersofdanbury.co.uk
Bakers of Danbury recently carried out a refurbishment at Witham Fire Station which included two classrooms and an office. Chrysotile asbestos was removed from the ceilings of the classrooms before works began. Works
The octagonal spire roof, which is covered with cedar shingles has suffered extensive damage caused by woodpeckers pecking holes in the shingle roof. Bakers will first remove the softwood cedar shingles from the
Summary: Refurbishment and alterations to Westminster Abbey InfirmaryLocation: Westminster, LondonChallenge: Access to this part of Westminster Abbey is restrictedSolution: Bakers of Danbury carried out refurbishment and alterations to Westminster Abbey Infirmary providing a
Bakers carried out a re-order of the church which included a new mezzanine floor with a glass screen entrance within the tower to allow the tower to become a usable space. Externally, stone
The 42 week refurbishment and new build extension project consisted of two phases with individual projection completion and sign off dates for handover. Both phases were completed to deadline and within contract sum.
Alex Bishop, a year 12 student from a high school in Chelmsford has joined our Church Department this week to gain some work experience. Alex contacted Bakers to ask for a work experience
Completed in December 2020, Bakers managed a four month project carrying out restoration to St Nicholas Church in Harwich, Essex. The existing cement render to the parapet walls was cracking and blown in
Bakers of Danbury are delighted to announce that we have achieved and are now accredited to ISO 9001:2015, after undergoing a successful three day audit late last year, of our Quality Managements Systems
Bakers of Danbury are delighted to announce that we recently achieved Altius Assured Vendor status, by passing a rigorous independent assessment and accreditation process. Achieving the Altius Assured Vendor status is part of
Bakers of Danbury recently completed the new build detached house, consisting of a 3 bedrooms. The chalet style house was of a timber frame construction with a hand cut roof with a slate
Bakers of Danbury were initially tasked with phase one of works which began May 2019 and involved six weeks stripping all fire damaged material and making the structure safe after it had suffered
Restoration works have recently been carried out by Bakers of Danbury Ltd, to the remaining stonework belonging to what is said to be the oldest Christian Church in England. The remains of the
Bakers of Danbury have been awarded a place on the Essex County Council Construction Framework 2. The construction framework is intended for use in the procurement of range of new build and refurbishment
One of the largest parish churches in Essex, the building dates mainly from the fifteenth century. The west main entrance was re-ordered to incorporate new storage units in bespoke manufactured in English Oak
In time for Remembrance Sunday and Remembrance Day yesterday, Chelmsford City Council commissioned Bakers of Danbury Ltd to carry out a complete restoration to Chelmsford War Memorial, which sits to the front (north)
To repair this property after it had suffered from subsidence. Subsidence repairs included the removal of render and installed expanded metal lathe repairs throughout every room within the property. The porch doors and