Summary = Roof works to the medieval South Triforium and the Great Cloister within Westminster Abbey.

Value = Approximately £1,450,000

Location = Westminster, London

Architect = Ptolemy Dean Architects Ltd

Challenge = Access issues and restrictions due to the main access route into site being through the Great Cloister - a busy area of the Abbey accessible to the public from 9.30am every day.

Solution = Under the instruction from Ptolemy Dean Architects Ltd (Westminster Abbeys Surveyor of the fabric) Bakers carried out roof works to the medieval South Triforium and the Great Cloister within Westminster Abbey.

70ft above the Abbey floor, the new gallery provides visitors with magnificent views down over the Abbey buildings and the Palace of Westminster. Roof works carried out by Bakers involved stripping the existing roof, recasting original lead and re-leading part of the South Triforium and part of the Main Cloister.

A full overhaul of the rainwater goods was also carried out, with a combination of new and refurbished lead downpipes, hoppers and chutes fitted. A new hopper, corbel stone and 22 metre downpipe was introduced, formed to mirror the Christopher Wren era hoppers that were already in use.

Bakers increased the gradient of the Triforium roof by increasing the fall of the lead bays (compliant with lead sheet association guidelines). Other structural repairs included reinforcing 300-year-old oak primary rafters using a flitch plate repair and other associated structural repairs to the oak roof.

Other works include the provision of a new access hatch and fall arrest system, stone repairs and indents to internal and external elevations and the careful re-homing of monuments and statues from other parts of the Abbey onto the Triforium floor.

The new freestanding external access ladder with a handrail was crafted from European Oak. It was a good project for our recently qualified joiner Jack Darvill to work on.

With the improvements to the rainwater goods, Bakers also undertook the renewal of the below ground drainage within the Great Cloister, which will also included the exciting addition of a fountain positioned in the centre of the Cloister, formed on York Stone paving with a lead cistern fountain.

Works were completed Spring 2018, in time for the opening of a new museum and gallery, located in the Abbey's medieval Triforium. After being hidden from public over 700 years, the Triforium became “The Queen's Diamond Jubilee Galleries”.

Jim Vincent, Clerk of the Works at Westminster Abbey said:

Bakers of Danbury have successfully managed access issues and restrictions whilst carrying out the works at the Abbey. The main access route into site is through the Great Cloister, which is a busy area of the Abbey accessible to the public from 9.30am every day.

We have found Bakers of Danbury to be considerate of the public and employees of the Abbey and have undertaken the works to the Abbey with the utmost care and attention at all times and look forward to continuing our working relationship with them in the future. The high standard of work is commensurate with the status of the building and is what is expected of contractors working at Westminster Abbey."

Alan Titchmarsh Dedicates Fountain

After recently completing roof works and the renewal of below-ground drainage within the Great Cloister to Westminster Abbey; Chris Norman, Contracts Manager for Bakers of Danbury Ltd, was invited to attend a Dedication Ceremony during which the new Cloister Garth Fountain was dedicated to the famous 18th-century landscape gardener Lancelot “Capability” Brown.

Positioned in the centre of the Great Cloister to Westminster Abbey, the lead cistern fountain sits over an old monastic well in the garth. It is formed on York Stone paving provided by Bakers of Danbury’s sister company Collins and Curtis Masonry Ltd. The fountain was designed by Ptolemy Dean, the Abbey’s Surveyor of the Fabric with the assistance of TV gardener Alan Titchmarsh, who also attended the dedication and gave reflection.

The Closter Garth Fountain marks the tercentenary of the birth of landscape gardener Lancelot “Capability” Brown. Known as “England’s greatest gardener”, “Capability” Brown designed over 170 parks and gardens – for many of which water plays a big part in their design. He was nicknamed “Capability” because he used to tell his clients their property had “capability” for improvement. Some of his work can still be admired in Kew Gardens in South West London, Chatsworth House in Derby, Warwick Castle and Blenheim Palace in Oxfordshire. Later he was Master Gardener at Hampton Court Palace and Richmond.

The Ceremony took place following the Evensong taken by the Dean of Westminster, the Very Reverend Dr John Hall. A week later Alan Titchmarsh attended Westminster Abbey again, this time to meet the Queen during the formal opening of “The Queen's Diamond Jubilee Galleries”, a new museum and gallery located in the Abbey's medieval Triforium.

70ft above the Abbey floor, the new gallery provides visitors with magnificent views down over the Great Cloister, Abbey buildings and the Palace of Westminster. From the gallery, Alan Titchmarsh showed Queen Elizabeth the new Cloister Garth Fountain.

The roof works carried out by Bakers which involved stripping the existing roof, recasting original lead and re-leading part of the South Triforium and part of the Main Cloister can also be viewed from The Queen's Diamond Jubilee Galleries.

Around the sides of the cistern on several panels is a quote from Horace Walpole:

  • WITH ONE LOST PARADISE THE NAME
  • OF OUR FIRST ANCESTOR IS STAINED;
  • BROWN SHALL ENJOY UNSULLIED FAME
  • FOR SO MANY A PARADISE REGAINED.
  • With the inscription:

  • 1716 1783 LANCELOT CAPABILITY BROWN.
  • HE SOUGHT AN IMAGE OF HEAVEN.
  •  

    Westminster Abbey

    Under the instruction from Ptolemy Dean Architects Ltd (Westminster Abbeys Surveyor of the fabric) Bakers are currently carrying out roof works to the medieval South Triforium and the Great Cloister within Westminster Abbey.

    The roof works will be completed in time for the opening of a new museum and gallery, located in the Abbey's medieval Triforium, next year. After being hidden from public over 700 years, the Triforium will become “The Queen's Diamond Jubilee Galleries”.

    70ft above the Abbey floor, the new gallery will provide visitors with magnificent views down over the Abbey buildings and the Palace of Westminster. Roof works carried out by Bakers involve stripping the existing roof, recasting original lead and re-leading part of the South Triforium and part of the Main Cloister.

    A full overhaul of the rainwater goods is also being carried out, with a combination of new and refurbished lead downpipes, hoppers and chutes being fitted. A new hopper, corbel stone and 22 metre downpipe has been introduced, formed to mirror the Christopher Wren era hoppers that are already in use.

    Bakers are increasing the gradient of the Triforium roof by increasing the fall of the lead bays (compliant with lead sheet association guidelines). Other structural repairs include reinforcing 300-year-old oak primary rafters using a flitch plate repair and other associated structural repairs to the oak roof.

    Other works include careful rehoming of monuments and statues from other parts of the Abbey onto the Triforium floor.

    With the improvements to the rainwater goods, Bakers will undertake the renewal of the below ground drainage within the Great Cloister, which will also include the exciting addition of a fountain to be positioned in the centre of the Cloister, formed on York Stone paving with a lead cistern fountain. These works will continue into Spring 2018.

    Jim Vincent, Clerk of the Works at Westminster Abbey said:

    Bakers of Danbury have successfully managed access issues and restrictions whilst carrying out the works at the Abbey. The main access route into site is through the Great Cloister, which is a busy area of the Abbey accessible to the public from 9.30am every day.

    We have found Bakers of Danbury to be considerate of the public and employees of the Abbey and have undertaken the works to the Abbey with the utmost care and attention at all times and look forward to continuing our working relationship with them in the future. The high standard of work is commensurate with the status of the building and is what is expected of contractors working at Westminster Abbey."