Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon sheet surface membrane system with lapped and welded seams
Value = £65,000
Location = Beal Academy, Essex
Summary = Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon sheet surface membrane system with lapped and welded seams, before installation of the new flooring (Premier Plus Area Elastic Sprung Floor System). System finished in Sport Linoluem with one colour throughout. Total thickness 35mm. Markings included badminton, basketball, volleyball and netball.
Flood Damage, Beal Academy Essex
Value = £65,000
Location = Beal Academy, Essex
Summary = Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon sheet surface membrane system with lapped and welded seams, before installation of the new flooring (Premier Plus Area Elastic Sprung Floor System). System finished in Sport Linoluem with one colour throughout. Total thickness 35mm. Markings included badminton, basketball, volleyball and netball.
Contact Us