Bakers carried out a re-order of the church which included a new mezzanine floor with a glass screen entrance within the tower to allow the tower to become a usable space. Externally, stone repair and re-pointing was carried out to the south and partial west elevations.
Summary: Church re-ordering and new mezzanine floor within tower to make it a usable space.
Location: Impington, Cambridgeshire
Challenge: The existing 15th century wall paintings needed to be protected and later restored
Solution: Bakers carried out a re-order of the church which included a new mezzanine floor with a glass screen entrance within the tower to allow the tower to become a usable space. Externally, stone repair and re-pointing was carried out to the south and partial west elevations. A new lead roof was installed to the tower and the church was decorated throughout, whilst protecting the early 15th century paintings which were later restored.
Church Tower Mezzanine Floor
Summary: Church re-ordering and new mezzanine floor within tower to make it a usable space.
Location: Impington, Cambridgeshire
Challenge: The existing 15th century wall paintings needed to be protected and later restored
Solution: Bakers carried out a re-order of the church which included a new mezzanine floor with a glass screen entrance within the tower to allow the tower to become a usable space. Externally, stone repair and re-pointing was carried out to the south and partial west elevations. A new lead roof was installed to the tower and the church was decorated throughout, whilst protecting the early 15th century paintings which were later restored.