Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon
Eves Corner, Danbury, CM3 4QB 01245 225876 info@bakersofdanbury.co.uk
Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon
Use reclaimed Suffolk white bricks to form a low plinth detail to match the church. Formed a new internal stone archway and door through to church, provision of accessible WC and kitchenette and
Reinstatement following fire and subsequent water damage. It was an asbestos construction, requiring specialist removal and disposal. Works included new roof, external cladding and a complete refit of all internal areas. Value
Works undertaken directly for Insurer following storm damage, Bat survey undertaken as a live colony of pipistrelle bats within loft space , works undertaken to allow colony to continue to roost and scaffold
Full temporary roof, the works were carried out accessing from the roof and contained the area within the loft. The breakthrough was carried out during the clients holiday when the stairs were installed