The challenge was digging the pockets in between the trees as the trees prevented the digger from being able to get to where it needed to excavate. Bakers of Danbury carried out hand digging where the trees prevented access for the digger. Bakers also adjusted some of the placements to achieve equally spaced ties.
Summary = Major repair and strengthening work carried out to the church wall
Location = Holy Trinity Church in Halstead
Challenge = The challenge was digging the pockets in between the trees as the trees prevented the digger from being able to get to where it needed to excavate. Bakers of Danbury carried out hand digging where the trees prevented access for the digger. Bakers also adjusted some of the placements to achieve equally spaced ties.
Solution = To repair and strengthen the wall Bakers of Danbury dug ten 1.2m3 pockets along the length, to the back of the 36m churchyard boundary wall. The pockets were poured with concrete which was cast around 1.6m long stainless steel rods. The rods had been inserted through the wall. On the wall face they were tied and bolted to steel pattress plates.
To provide additional reinforcement, two lengths of Helifix reinforcing ties, set in resin were inserted along the face of the wall, extending the whole 36m length.
Cllr Mick Radley, Mayor and Chairman of Halstead Town Council said;
“I’m really pleased that the council has taken action to conduct major repair work to the Holy Trinity Church boundary wall and to recognise the excellent work that has been done. The wall has been leaning for a number of years and the recent repair work has now strengthened the wall along its length to hold it in place.
This work was conducted as part of the Town Council’s obligations to maintain closed churchyards and was funded from financial reserves specifically allocated to the work. Design work was commissioned to The Morton Partnership and the repair work to Bakers of Danbury Heritage Ltd. I would like to thank all of those involved with the repair for the excellent work they have done and with minimum disruption to the community.”
Church Wall Strengthening & Repair
Summary = Major repair and strengthening work carried out to the church wall
Location = Holy Trinity Church in Halstead
Challenge = The challenge was digging the pockets in between the trees as the trees prevented the digger from being able to get to where it needed to excavate. Bakers of Danbury carried out hand digging where the trees prevented access for the digger. Bakers also adjusted some of the placements to achieve equally spaced ties.
Solution = To repair and strengthen the wall Bakers of Danbury dug ten 1.2m3 pockets along the length, to the back of the 36m churchyard boundary wall. The pockets were poured with concrete which was cast around 1.6m long stainless steel rods. The rods had been inserted through the wall. On the wall face they were tied and bolted to steel pattress plates.
To provide additional reinforcement, two lengths of Helifix reinforcing ties, set in resin were inserted along the face of the wall, extending the whole 36m length.
Cllr Mick Radley, Mayor and Chairman of Halstead Town Council said;
To keep up to date on similar conservation projects carried out by Bakers of Danbury visit our Latest News page or the Bakers of Danbury Facebook page.