The river was originally diverted using large drainage pipes and later dammed to control water levels. This allowed access for scaffolding to be erected and works to be carried out particularly below the usual water level. Works included removal of modern cements, re-rendering in traditional materials
Value
£170,000
Location
Gayners Park, Old Upminster
Client
Havering Borough Council
Summary
Refurbishment of Grade II Listed bridge over a lake
Challenge
Working over a river- some of the works carried out were below the water line.
Solution
The river was originally diverted using large drainage pipes and later dammed to control water levels. This allowed access for scaffolding to be erected and works to be carried out particularly below the usual water level. Works included removal of modern cements, re-rendering in traditional materials – lime and roman cements, structural repairs, new balustrading and new surface to bridge.
Failure of foundation system, Bishop Stortford
Value
£170,000
Location
Gayners Park, Old Upminster
Client
Havering Borough Council
Summary
Refurbishment of Grade II Listed bridge over a lake
Challenge
Working over a river- some of the works carried out were below the water line.
Solution
The river was originally diverted using large drainage pipes and later dammed to control water levels. This allowed access for scaffolding to be erected and works to be carried out particularly below the usual water level. Works included removal of modern cements, re-rendering in traditional materials – lime and roman cements, structural repairs, new balustrading and new surface to bridge.