Tag Archives: school builders

Westminster Deanery

Summary = A refurbishment and roofing project at Westminster Deanery, which sits within the grounds of Westminster Abbey.

Location = Westminster, London

Challenge = Nationwide Lock down due to the Covid-19 pandemic

Solution = Works continued safely on site during the Covid-19 lockdown, due to sensible planning and safe working procedures put in place on site. Bakers are currently midway through the £1.8 million refurbishment and roofing project at Westminster Deanery, which sits within the grounds of Westminster Abbey.

  • Westminster Deanery roof works
  • Roof works carried out by Bakers involved stripping the existing roof, recasting original lead and re-leading the roof adjacent to the West Towers of the abbey. The pitched tiled roof area was also stripped, with structural repairs undertaken and then retiled with a mix of reclaimed peg tiles and new handmade tiles . A full overhaul of the rainwater goods is also being undertaken, with refurbished cast iron and lead downpipes, hoppers and chutes. Bakers increased the gradient of the roof (compliant with lead sheet association guidelines).

  • Westminster Deanery refurbishment works
  • The entire deanery including a grand function room are being renovated which includes five bedrooms, a kitchen, utility, dining area and the Dean's study and offices, along with two bathrooms and the addition of one new bathroom. Upgraded electrical and mechanical installations are being completed, along with improvements to insulation wherever possible. Full decoration is also being undertaken externally, including the 15th Century elevation being stripped of many layers of paint to reveal the original brickwork façade underneath.

    A new hardwood doorway and canopy will lead to the refurbished garden, which will be landscaped and have new drainage installed before the Deanery is handed back at the end of this year.

    To hear more about this and other projects visit our Latest News page or the Bakers of Danbury Facebook page.

    Westminster School

    Summary = Bakers of Danbury Ltd are currently building an extension to Westminster School. The extension includes meeting and teaching space as well as offices for school staff. Bakers have completed phases one and two which involved the demolition of the existing building and an archaeological dig. We are currently working on phase three.

    Location = Westminster, London

    Challenge = Access is restricted due to working on a live school. Westminster School is the only ancient school in London which still occupies its original site. The site of the new extension is very closely surrounded by Grade I Listed buildings, some dating back to the 11th century.

    Solution = Phase one involved the careful demolition of the modern concrete music centre in Little Dean’s Yard. The demolition was carried out carefully to protect the Grade I Listed buildings surrounding the site.

    Careful demolition and breaking out was also carried out on the reinforced concrete foundation to the music center to protect the archaeology below ground.

    During phase two Bakers oversaw archaeological excavations, which were carried out in conjunction with Pre-Construct Archaeology. The archaeological excavations uncovered part of the original kitchen to the Monks Abbey dating back to the 11th century. A section of the new build floor will be cantilevered glass - creating a platform from which to view the archaeology below ground level, which was exposed during archaeological excavations.

    Working under the instruction of Ptolemy Dean Architects Ltd, Bakers of Danbury are currently working on phase three of the project. During this phase Bakers will be using traditional building techniques and materials to create a new build extension. The new extension will be constructed with handmade bricks, reclaimed tiles, lead roofing and handmade timber and lead windows. The extension will house a new teaching/ meeting area and offices for the school staff.

    Bakers will also carry out internal renovation works and external restoration works to a number of surrounding school buildings.

    This project will also include a full M&E package which includes the new build extension and existing school buildings, as well as landscaping to Little Deans Yard, which lays the front of Westminster School.

    Chelmsford High School for Girls

    Summary = Enabling works to Chelmsford County High School for Girls ahead of the construction of a new Sports Hall and teaching block, which will include additional science facilities

    Location = Chelmsford, Essex

    Challenge = Removal of an existing building in a live school

    Solution = Enabling works to Chelmsford County High School for Girls which included the following:

  • Removal of the existing building called Bancroft and infilling the site
  • Division of existing services from Bancroft, in order to keep the swimming pool and all other blocks operational
  • Clearance and re-levelling of work site, including embankment adjacent to science block
  • Sawston Village College

    Summary = Roof works and internal decoration to two college buildings

    Location = Cambridgeshire

    Challenge = The Grade II Listed buildings had to be protected from the weather whilst the roofs were stripped and replaced

    Solution = The project was divided into two phases and temporary roofs protected the Grade II Listed Henry Morris building during Phase one and the North Wing during Phase two of works.

    Phase one of works to Sawston Village College, an academy school founded in 1930, began April 2019. Works involved the installation of the temporary roof whilst the stripping and re-roofing of the Grade II Listed Henry Morris building took place. The existing pantiles were re-laid to the front elevation of the building and new handmade pantiles were installed to the back.

    Below the roof, the deteriorating lath and plaster ceiling to the main hall was replaced with new, which included the installation of new laths, scratch coat and a finish of thermalime plaster previously approved by the Conservation Officer. Existing facia boards were replaced and the cast iron gutters and downpipes were thoroughly sanded back to metal and painted. The bell tower underwent extensive repairs to the leaded lights, structural timber and boarding.

    The second phase of works included roof works to the North Wing of the College, similar to the roof works to the Henry Morris building. All roof works and internal decoration was completed in time to hand back to the College for the new Academic New Year.