As the extension was for a new kitchen / family room; bakers provided the client with a temporary kitchen to use during works, until the new kitchen was installed and final breakthrough into
Eves Corner, Danbury, CM3 4QB 01245 225876 info@bakersofdanbury.co.uk
As the extension was for a new kitchen / family room; bakers provided the client with a temporary kitchen to use during works, until the new kitchen was installed and final breakthrough into
The church department have spent the summer of 2017 removing the existing lead and boarding to the Victorian Song School roof structure which over the years had been sagging due to its poor
Bakers of Danbury's onsite joinery workshop carries out traditional wood carving among many other skilled joinery services. Our bench joiner and wood carver, Norman Valentine hand carved a number of crocus detail for
The river was originally diverted using large drainage pipes and later dammed to control water levels. This allowed access for scaffolding to be erected and works to be carried out particularly below the
Conservation to the ruins of All Saints’ Church which is located within the grounds of Colchester Zoo, Essex. Conservation works included brickwork, rubble walling & stone masonry. Value = £125,000 Location = Stanway,
Conservation of rubble, flint walling & stone masonry to historic Norman walls. Value = £160,000 Location = Colchester, Essex Summary = Conservation of rubble, flint walling & stone masonry to historic Norman walls.
Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon
Reinstatement following fire and subsequent water damage. It was an asbestos construction, requiring specialist removal and disposal. Works included new roof, external cladding and a complete refit of all internal areas. Value
Works undertaken directly for Insurer following storm damage, Bat survey undertaken as a live colony of pipistrelle bats within loft space , works undertaken to allow colony to continue to roost and scaffold