This enquiry was surveyor lead and had to be completed as soon as possible to get the family out of temporary accommodation and back into their own house. This was necessary due to
Eves Corner, Danbury, CM3 4QB 01245 225876 info@bakersofdanbury.co.uk
This enquiry was surveyor lead and had to be completed as soon as possible to get the family out of temporary accommodation and back into their own house. This was necessary due to
Bakers of Danbury worked with Peabody Trust regarding the specifications as the apartment was owned by the housing association. After asbestos had been removed, Bakers of Danbury carried out a strip out. The
After Bakers of Danbury took the enquiry from the Insurance Loss Adjuster on a Friday afternoon, they arranged for an electrician to visit the property within hours, to install a new fuse board
To repair this property after it had suffered from subsidence. Subsidence repairs included the removal of render and installed expanded metal lathe repairs throughout every room within the property. The porch doors and
A subsidence claim for which Bakers of Danbury removed the patio at the rear and a slab to the side of the house, in preparation for carrying out piling to the property. Once
The river was originally diverted using large drainage pipes and later dammed to control water levels. This allowed access for scaffolding to be erected and works to be carried out particularly below the
The river was originally diverted using large drainage pipes and later dammed to control water levels. This allowed access for scaffolding to be erected and works to be carried out particularly below the
To manufacture and fit new finial and redecorations following impact damage. Finial and detailed fascia, manufacture off site in Bakers of Danbury in-house joinery shop to match damaged finial and detailed fascia. Value
Following a flash flood, external drainage works were undertaken before the replacement of performance flooring to the sports hall. Works involved the removal of the existing parquet flooring, supply and installation of platon
Reinstatement following fire and subsequent water damage. It was an asbestos construction, requiring specialist removal and disposal. Works included new roof, external cladding and a complete refit of all internal areas. Value
Works undertaken directly for Insurer following storm damage, Bat survey undertaken as a live colony of pipistrelle bats within loft space , works undertaken to allow colony to continue to roost and scaffold